Application Guide

How to Apply for Interconnection Manager or Director

at Origis Energy

๐Ÿข About Origis Energy

Origis Energy is a leading renewable energy company accelerating the shift to carbon-free energy through innovative solar, storage, and decarbonization solutions. With a strong pipeline of utility-scale projects across the U.S., Origis offers a dynamic, mission-driven environment where you can directly impact the clean energy transition.

About This Role

As Interconnection Manager or Director, you will oversee the entire interconnection process for Origisโ€™s utility-scale solar and storage projects, from initial studies through compliance. This role is critical to ensuring projects connect to the grid on time and within budget, directly influencing Origisโ€™s project success and growth.

๐Ÿ’ก A Day in the Life

A typical day might start with reviewing interconnection study results from a consultant for a 200 MW solar project in MISO, then joining a call with an RTO to discuss tariff changes. Afternoon could involve collaborating with the development team to assess feasibility of a new site, followed by preparing a presentation for a utility stakeholder meeting.

๐ŸŽฏ Who Origis Energy Is Looking For

  • An electrical engineer (BS required, MS/MBA preferred) with 5-7+ years of experience in renewable power system analysis, specifically interconnection studies for solar and storage.
  • Proven expertise in generation interconnection model development (PSS/E, PSLF, etc.) and familiarity with ISO/RTO tariffs (e.g., MISO, PJM, CAISO, ERCOT).
  • Strategic thinker with strong analytical and problem-solving skills, able to evaluate study reports, identify risks, and recommend cost-effective solutions.
  • Excellent communicator and collaborator, comfortable representing Origis in technical meetings with utilities and regulatory bodies, and working cross-functionally with development, engineering, and finance teams.

๐Ÿ“ Tips for Applying to Origis Energy

1

Highlight specific experience with interconnection study processes (e.g., System Impact Study, Facilities Study) and mention the ISOs/RTOs you have worked with.

2

Quantify your impact: e.g., 'Managed interconnection for 500 MW of solar projects across 3 ISOs, reducing study timelines by 20%.'

3

Emphasize familiarity with Origisโ€™s target markets (e.g., Southeast, MISO, ERCOT) and any experience with FERC Order 2023 or evolving interconnection rules.

4

If you have a Master's or MBA, state it clearly in your resume summary; these are highly preferred.

5

Tailor your resume to show leadership and strategic contributions, not just technical execution, as this role has a director-level track.

โœ‰๏ธ What to Emphasize in Your Cover Letter

['Your technical expertise in interconnection modeling and study management for utility-scale solar and storage.', 'Your ability to develop transmission strategy and influence policy at ISOs/RTOs to benefit project pipelines.', 'Specific examples of how youโ€™ve mitigated interconnection risks and saved costs on past projects.', 'Your alignment with Origisโ€™s mission of accelerating carbon-free energy and your enthusiasm for remote, collaborative work.']

Generate Cover Letter โ†’

๐Ÿ” Research Before Applying

To stand out, make sure you've researched:

  • โ†’ Review Origisโ€™s project portfolio and pipeline: which regions and technologies (solar, storage, hybrid) are they focusing on?
  • โ†’ Understand the interconnection queue status and recent challenges in key ISOs like MISO, PJM, and CAISO.
  • โ†’ Read about FERC Order 2023 and its potential impact on interconnection processes for renewables.
  • โ†’ Look into Origisโ€™s company culture and remote work policies; check recent news or press releases about their projects.

๐Ÿ’ฌ Prepare for These Interview Topics

Based on this role, you may be asked about:

1 Describe a time you managed a complex interconnection study that faced delays or cost overruns. How did you resolve it?
2 How do you stay updated on changing interconnection tariffs across different ISOs/RTOs?
3 Walk us through your process for evaluating a new projectโ€™s interconnection feasibility and identifying red flags.
4 How would you represent Origis in a stakeholder meeting to advocate for policy changes that benefit renewable interconnection?
5 What strategies do you use to coordinate internal teams (development, engineering) and external consultants effectively?
Practice Interview Questions โ†’

โš ๏ธ Common Mistakes to Avoid

  • Failing to demonstrate hands-on experience with interconnection study software (e.g., PSS/E, PSLF) and tariff interpretation.
  • Being too generic about renewable energy without showing specific knowledge of interconnection challenges and solutions.
  • Overlooking the business/strategic aspect of the role โ€“ this is not purely technical; emphasize your ability to manage risks and influence outcomes.

๐Ÿ“… Application Timeline

This position is open until filled. However, we recommend applying as soon as possible as roles at mission-driven organizations tend to fill quickly.

Typical hiring timeline:

1

Application Review

1-2 weeks

2

Initial Screening

Phone call or written assessment

3

Interviews

1-2 rounds, usually virtual

โœ“

Offer

Congratulations!

Ready to Apply?

Good luck with your application to Origis Energy!