Application Guide

How to Apply for Senior Project Manager - West Coast

at EVgo

🏢 About EVgo

EVgo is a leader in the rapidly expanding EV charging infrastructure sector, operating one of the nation's largest public fast charging networks. The company stands out for its mission-driven approach to accelerating electric vehicle adoption through convenient, reliable charging solutions, offering the opportunity to work at the forefront of sustainable transportation technology.

About This Role

As Senior Project Manager - West Coast, you'll lead end-to-end execution of EV charging station installations across the region, from planning through construction completion. This role is impactful because you'll directly contribute to expanding EVgo's network infrastructure, enabling more drivers to transition to electric vehicles while ensuring projects meet regulatory, safety, and timeline requirements.

🎯 Who EVgo Is Looking For

  • Has 8+ years of construction/project management experience with electrical systems expertise, particularly in utility coordination and permitting processes for infrastructure projects
  • Demonstrates hands-on experience with EV charging technologies, standards (like NEC and ADA compliance), and familiarity with West Coast regulatory environments
  • Is proficient with project management tools specifically mentioned (Site Tracker, MS Project, Excel) and has managed complex stakeholder relationships with contractors, municipalities, and site hosts
  • Possesses strong understanding of construction safety standards and can navigate the unique challenges of EV charging station installations

📝 Tips for Applying to EVgo

1

Quantify your experience with EV charging or electrical infrastructure projects - specify number of stations installed, project values, or regional permitting successes

2

Highlight specific West Coast experience with utilities, municipalities, or regulatory bodies relevant to EV charging installations

3

Mention proficiency with Site Tracker specifically (not just generic PM tools) and how you've used it for construction project management

4

Include examples of managing projects with multiple stakeholders including site hosts (like retail locations) and local authorities

5

Demonstrate understanding of EVgo's network expansion strategy by referencing their current West Coast presence or recent projects

✉️ What to Emphasize in Your Cover Letter

['Your direct experience managing EV charging station or similar electrical infrastructure projects from planning through construction', 'Specific successes navigating West Coast permitting processes and utility coordination for construction projects', "How you've ensured compliance with NEC, ADA, and safety standards in previous projects", 'Your approach to being the primary construction point of contact for diverse stakeholders including site hosts and municipalities']

Generate Cover Letter →

🔍 Research Before Applying

To stand out, make sure you've researched:

  • EVgo's current West Coast network map and expansion announcements to understand their regional strategy
  • Recent partnerships or projects EVgo has completed with site hosts like retailers or municipalities
  • Specific regulatory challenges for EV charging in West Coast states (California, Oregon, Washington)
  • EVgo's technology standards and any proprietary systems they use for project management

💬 Prepare for These Interview Topics

Based on this role, you may be asked about:

1 Walk us through your experience with a complex EV charging station installation, including challenges with permitting or utility coordination
2 How do you manage project schedules and budgets when dealing with multiple contractors and vendors simultaneously?
3 Describe your experience being the primary construction point of contact and how you handle conflicting stakeholder priorities
4 What specific steps do you take to ensure compliance with NEC, ADA, and safety standards throughout construction?
5 How would you approach managing remote West Coast projects while being based remotely yourself?
Practice Interview Questions →

⚠️ Common Mistakes to Avoid

  • Applying with generic construction PM experience without specific electrical/EV charging examples
  • Failing to address the remote West Coast aspect and how you'd manage geographically dispersed projects
  • Not demonstrating understanding of the specific compliance requirements mentioned (NEC, ADA, safety standards)

📅 Application Timeline

This position is open until filled. However, we recommend applying as soon as possible as roles at mission-driven organizations tend to fill quickly.

Typical hiring timeline:

1

Application Review

1-2 weeks

2

Initial Screening

Phone call or written assessment

3

Interviews

1-2 rounds, usually virtual

Offer

Congratulations!

Ready to Apply?

Good luck with your application to EVgo!