Climate & Environment Contract

Senior Consultant, Load Interconnection (MISO/PJM)

Crusoe

Posted

May 01, 2026

Location

Remote (US)

Type

Contract

Compensation

$208000 - $312000

Mission

What you will drive

  • Perform and support comprehensive grid integration studies for large-load facilities within MISO and PJM.
  • Manage transmission injection processes and perform load deliverability studies to ensure grid stability and capacity.
  • Strategize Points of Interconnection (POIs) based on evolving business needs and changing regulatory requirements.
  • Contribute to the technical development of the team, sharing expertise and best practices in grid integration and ISO/RTO navigation.

Impact

The difference you'll make

This role enables the integration of large-scale compute loads into the power grid, supporting the expansion of AI infrastructure while utilizing stranded energy and reducing environmental impact.

Profile

What makes you a great fit

  • Masterโ€™s degree in Power Systems with 3+ years of experience, or a Bachelorโ€™s degree with 5+ years of experience in power systems.
  • Deep experience in grid planning, system modeling, and grid code compliance studies.
  • Strong working knowledge of MISO/PJM transmission topology and load interconnection methodologies.
  • Excellent technical report writing and verbal communication skills.

Benefits

What's in it for you

Compensation: $100-$150/hour (full-time, 3-6+ month contract). Crusoe is an Equal Opportunity Employer.

About

Inside Crusoe

Crusoe is on a mission to align the future of computing with the future of the planet by unlocking stranded energy and delivering it to energy-intensive computation, pioneering sustainable energy and digital infrastructure.